Creating Environmentally Sustainable Buildings ™

Common O&M's

Here is the companion to our list of Common ECMs. This is a compilation of Operations and Maintenance Measures that are often recommended after performing walk-thru Energy Audits.

  • Reduce DHW Temp
  • Use low-wattage fluorescents
  • Change Dirty Air Filters
  • Repair Leaks (steam or water)
  • Insulate Bare Piping
  • Weatherstrip 7amp; Caulk
  • Shut Off Reheat (when feasible)
  • Insulate Water Htr
  • Clean AHU Coils
  • Low Flow Showerheads
  • Valve Insulation
  • Calibrate HVAC Controls
  • Replace Steam Traps